by Max Barry

Latest Forum Topics

Advertisement

Post

Region: The Kodiak Republic

Ok guys, my railway services is done, I made a huge advancement. Now I can focus on a 50.000.000 DZG$ for another project: expand the int'l airport's terminal. Here is the info:

Gates: 16 --> 32
Jet bridges: 5 --> 12
Lounges: 0 --> 3 lounges of 3000 m2
Size: 60000 m2 --> 100000 m2
Baggage claim belts: 6 --> 10
Check-in desks: 49 --> 82
Spaces for bars, souvenirs & others: 30 --> 75
Duty free size: 1500 m2 --> 4500 m2
Runway length: 3500 m

All of this will make my airport handle around 15 million passengers easily. And I'm on a 25.000.000 DZG$ to make a secondary terminal, the T2. Both terminals will be connected by a railway system that will cost just 5.000.000 DZG$. Here is the T2 info:

Gates: 18
Jet bridges: 6
Lounges: 1 of 2000 m2.
Size: 75000 m2
Baggage claim belts: 7
Check-in desks: 55
Spaces for bars, souvenirs & others: 45
Duty free size: 3000 m2

I think it can easily handle 6 million passengers anually, so the 50.000.000 DZG$ I have left for this airport will be used on the making of a 3400 meters long runway. And yes, all of the jet bridges can be prepared to handle Airbus A380s and long-range planes. My economy has raised and the value of my currency has gone higher. It's now 1$ that makes 300 DZG$! Proud of myself.

ContextReport